1996
Establish TVP Trading Co., Ltd. to produce corrugated sheets and to provide coils and purlin
2000
-Build a steel pipe factory with a capacity of 10,000 tons / year
2003
- Establish TVP Steel Manufacturing & Trading Co., Ltd at 400 National Road 1A, Area 9, Ben Luc town, Ben Luc district, Long An province.
2005
- Establish a factory galvanized steel line with a capacity of 70,000 tons / year
- Establish a color coating line with a capacity of 40,000 tons / year
- Establishing Slitting factory 1
2006
- A Color coating line (with a capacity of 40,000 tons / year) comes into operation.
- Deploying steel pipe factory No. II
2007
- Galvanize line (capacity of 70,000 tons / year) comes into operation
- Setting up and using ISO 9001: 2000 system for production and business activities of the company.
2009
- Establishment and operation slitting factory No. II
- Establishing the second factory producing galvanize coil .
- Upgrade the ISO system to the new ISO 9001: 2008 standard
2010
- Honored to receive ISO 9001: 2008 certification by BUREAU VERITAS UK.
- Plant No. II galvanized line (with a capacity of 80,000 tons / year) comes into operation.
2011
- Installation color coating line No. II (capacity of 80,000 tons / year)
- Receiving the Prime Minister's Certificate of Merit.
- Build a steel pipe factory III
- Establishing Phuc Long industrial park and residential area
2012
- Color coating line No. II comes into operation (capacity of 80,000 tons / year)
- Expanding the factory to Phuc Long industrial park
- Receiving the Government's Emulation Flag
- Received the Third Class Labor Medal
2013
- Honored to receive ISO 9001: 2008 certificate issued by TUV 2 SUD
- Upgrade production capacity of color line I to 60,000 tons / year
- Slitting lines No. III, IV and steel pipe plant III came into operation
2014
- Slitting line and small-format cold-rolled line come into operation.
- Deploying a cold rolling line with a capacity of 40,000 tons / year of Tenova Group in cooperation with US I2S supplier
2015
- Large cold rolling line is put into operation.
- Implementing a galvalume line project with a capacity of 300,000 tons / year by Danieli Italy
2016
- Galvalume line comes into operation.
- Expanding Phuc Long industrial park, phase II, with a total area of over 370 hectares